COTA Ingeniería ← Back to guides
Practical guide
ESPAÑOL

What to review before building a house on a lot

Before starting design or requesting construction budgets, it is important to understand the actual conditions of the property and the restrictions that may affect the project.

1. Property information

Verify area, boundaries, access, utility availability and general site conditions. Property documents should be consistent with the physical reality of the lot.

2. Zoning and planning regulations

Before defining the house, identify what can legally be built: permitted uses, setbacks, height limits, site coverage, buildable area and other rules applicable to the property.

3. Topographic survey

A topographic survey identifies slopes, levels, lot geometry and existing elements. This information directly affects site planning, earthworks and building design.

4. Soil study

A geotechnical study helps define ground conditions and provides a basis for foundation and structural design. It should not be replaced by assumptions or references from neighboring lots.

5. Access and construction logistics

Evaluate access for materials, equipment and transportation, as well as storage areas and site restrictions. These factors can significantly affect construction time and cost.

6. Preliminary budget

Before committing to an architectural solution, establish an investment range that considers studies, design, permits, construction and contingencies.

An initial property review does not replace the technical studies or specific permits required for each project.